What’s happening with the Library refurbishment #edincampuslib

The HWU Edinburgh Campus Library is going to be refurbished – we are ‘Transforming Your Library’ 
We will keep you updated through these blog posts and through our social media channels.  As well as details of the exciting new developments, we will keep you updated as to which spaces and resources are available in the Library during the enabling and refurbishing works.

What is happening when?

   
Monday 24th July

 

Ground Floor will continue to be closed for enabling work
Floor 1 and floor 2 will be open as normal
Floor 3there will be work to replace the ceiling slats on Floor 3 between Monday 24th July and Friday 28th July
The floor will be still open for study space and to use PCs but some areas will be cordoned off and access may be limited.

Enabling work on Floor 3 has involved moving some journals to off-site storage and removing some shelving.  This means that we have been able to create more space for study tables and chairs.  These will be moved into place in August in time for the new semester.

 

 

 

How do I get help if needed?
Ask at the Service Desk at the Edinburgh campus library or contact us by email or phone
https://www.hw.ac.uk/is/contactvisit-us.htm

Leave a comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s