The courtyard area to the front of the Edinburgh Campus Library is being revamped and improved. This will provide an exciting, new seating area for studying and socialising.



The construction work will start at on Monday September 20th and during this time, the main entrance to the Library will be out of use. Access to the Library will be from the east side around the back of the Library.
Please follow the path round the Library building and use the door near the museum and fire pond.
It will also be possible to access the Library via the Mary Burton building – please look out for signage.